Unsere Galerie

Kontaktdaten

CATEGORY

Project

BUDGET

6.000.000 €

DETAILS

LOCATION

Wien

START DATA

2023

DURATION

18 Monate

PROJECT SIZE

2050m2

[vc_row][vc_column][vc_row_inner][vc_column_inner][nd_options_spacer nd_options_height=”25″][nd_options_text nd_options_text_tag=”h2″ nd_options_text=”Project Description”][nd_options_spacer nd_options_height=”25″][vc_column_text]Along with the growth of economy, like other all other cities, Vienna has a expanding demand of living had led to more and more slabs being stacked on one another to maximize floor area of buildings. Consequently, suitable living conditions such as natural lighting, ventilation or relaxing spaces are more and more difficult to be adopted. To achieve this, we used green facade systems, advanced technologys by the heating-cooling systems and developt a smart building.[/vc_column_text][/vc_column_inner][/vc_row_inner][nd_options_spacer nd_options_height=”100″][vc_images_carousel images=”1629,1630,2132,2202,2203″ img_size=”900×700″ onclick=”link_no” speed=”20000″ autoplay=”yes” wrap=”yes” css=”.vc_custom_1629755711150{background-position: 0 0 !important;background-repeat: repeat !important;}”][/vc_column][vc_column][/vc_column][/vc_row]

Bodrum

NEXT